Use daily demand, replenishment lead time and a small, deliberate buffer to decide when a supply needs attention.

A reorder level tells you when to act

A reorder level is a trigger to review and replenish a supply. It is different from the quantity you order. The trigger needs to cover expected usage while a purchase moves through approval, ordering and delivery.

A practical starting formula is:

Reorder level = average daily usage × replenishment lead time + safety stock

Use the same time basis on both sides. If usage is measured per working day, measure lead time in working days too. Include internal approval time as well as the supplier’s delivery time when both delay replenishment.

Worked example: printer paper

Suppose an office uses an average of two reams per working day. It takes one working day to approve and place an order, then three working days for the supplier to deliver it. The purchasing lead chooses four extra reams as a starting buffer.

Illustrative reorder level for printer paper
InputValueMeaning
Average daily usage2 reamsPer working day
Approval and delivery4 working days1 internal + 3 supplier
Expected lead-time usage8 reams2 × 4
Safety stock4 reamsA chosen starting buffer
Reorder level12 reams8 + 4

At 12 reams, review stock and any open orders. The eight expected to be used before delivery leave four as a buffer if usage and lead time match the assumptions. This is a simple planning example, not a statistical service-level guarantee.

Check what is already on order

A shelf count alone can lead to duplicate purchases. Before ordering, check stock that is usable, supplies already committed and replenishment orders that will arrive in time.

Planning stock position = usable stock on hand + confirmed incoming stock − committed demand not already included in your usage forecast.

For example, nine usable reams plus ten confirmed incoming reams gives a planning position of 19, before any separate commitments. Check the incoming delivery date: an order arriving after the shelf runs empty does not solve the immediate shortage. Do not subtract the same demand twice if it is already included in your forecast.

Choose an order quantity separately

Once replenishment is needed, decide how much to buy. Consider pack sizes, storage space, budget, expected usage before the next review and supplies already on order.

If you want a target position of 30 reams and the planning position is nine, the gap is 21 reams. With five-ream packs, that rounds up to 25 reams if storage and budget allow. The target of 30 is a separate planning choice; the reorder formula does not set it for you.

Start with evidence, then adjust

  • Measure usage. Review recorded take-outs over a representative period. Exclude unusual one-time events from the baseline, or plan for them explicitly.
  • Measure the full wait. Record the time from identifying the need through approval and receipt, including partial deliveries.
  • Choose the buffer deliberately. A supply that stops work when it runs out may need a different buffer from an easily substituted item.
  • Review the outcome. If stockouts recur, check the assumptions and late orders. If stock keeps accumulating, review the trigger and order quantity.

Review levels when headcount, office attendance, supplier reliability or purchasing schedules change. A monthly review is one possible starting cadence; choose one that fits your operation.

A supply-by-supply review checklist

For each item, record:

  1. Supply name, unit of measure and usable quantity.
  2. Average usage and the period used to calculate it.
  3. Approval time and supplier lead time.
  4. Safety stock and the reason for that choice.
  5. Reorder level, open orders and expected delivery dates.
  6. Order quantity or target stock position, pack size and approver.
  7. Review date and any stockout or excess-stock notes.

Keep stock, approvals and receipts together

OfficeCloset brings office supply inventory, requests, purchasing and receiving into one shared workspace. Record minimum stock levels, review purchasing needs and follow orders through approval and delivery.